The main structure and working principle of 3TONS MANUAL OPERATION CRANE
Pageviews: Release Time:2017-12-06
the main structure parameters
outside drawing of 3T marine articulating boom crane
The main structure and working principle
The hand winch use hand swing the winch to retract and release the steel wire rope, then to lift. The specific operational approach refer to appended drawings of hand winch.