Live broadcast assemble & commissioning of marine hydraulic crane

Pageviews: Release Time:2017-11-14

Put the hydraulic system in the body of the tube, which is protected from the wind and the sun and rain. In order to extended service life
The electric control box is placed outside the tube for easy operation and debugging.
Next the driver's room
The barrel is partially installed and ready to be lifted the boom 
A lifting boom maching an oil cylinder, the price will increases by more of the telescopic boom.
The assembled crane needs to do load test
It is necessary to pass repeated tests to be qualified before leaving the factory

top Inquiry