These foundation remote control grab models can break up a variety of derivatives

Pageviews: Release Time:2017-05-24

These basic models can be derived from the same remote control grab up many outstanding freedom under the same width, and the same ability and adapt to the same kinds of remote control grab when regional harmony wind use (the last to channel type, lively style. With the knowledge of the Russian KBM with a total of sixty-four grab standard module three last time to the combination of the tower crane lifting capacity up to ask 200025004000-6000KNM, three kinds of rotary combination of tower crane lifting capacity up to 10001002500KNM. The Swedish LINDEN 8000 Series with the structural characteristics of standard remote control grab crane is balance arm fused, parts of the state if a giant hammer home called remote control grab, long-term overseas collectively referred to as the tower crane, 8000 Series with standard grab lifting capacity ranged from 1000-6000KNM, using sixty-one standard modules. Through the combination of display, allegedly can compose 41272 not grab isotropic energy, LINDEN8000 series combines standard not only on combination of tower crane hook range, combined with the lifting capacity range is relatively large, than a original width of 40 meters of crane 33 tons of 132KNM tower crane, by adding two boom extension and once the balance arm extension section and replaced by three modules, including the module and the module, the turntable, the tower body section of each module a width of 60 meters, can be revised The suspended load is 34 tons, 2040KNM tower crane, grab this by changing the three tower section, once the arm extension section and a remote control module could then become grab, lifting capacity is 3350KNM, the width of 50 meters, carrying 71 tons of crane remote control grab. The remote installation of grab machine structure, must pay attention to the following points: (1) sling specifications, length and sling installation shall comply with the requirements; (2) binding components, to identify the components of the intestinal center; (3) tied to firm; (4) when lifting off the ground, the first 30-50cm. To pause in the confirmation when there is no abnormality before lifting installation; (5) after once the components in place and ready to be active and reliable, once under the lifting parts; (6) did not have connections with the wrong. All screw and screw fastening the whole appearance of disabled are not used. Erection shall be carried out in sequence, in accordance with safety regulations, wear safety boots, and wear safety belts. No wine should be left in and out before installation. Internal and external jack up tower cranes, belt removal, remote control, grab and erection, such as skilled, and good institutions, fast deformity can be completed within a day. You will also want to know: the public bus crane, single girder crane, crane self lifting type remote control grab machine installation for assembling matters (jib tower section assembly, assembly and installation of ladder spare parts) and the erection process process friendly cooperation, the members of the group of high-quality, installation experience and competition as well as the installation site the working environment is to ensure the rapid erection of the favorable factors of tower crane. Open lock does not have repeated use, remote control grab after each removal must be renewed; (7) lifting boom, for the arm in position and facilitate joint arm root sling, should make the remote control grab arm head holding the arm should be slightly (up 11 degrees (8) and "lifting the balance arm. According to the same should be up 10.

top Inquiry